Case Study
Farah Hospital To Save $416,085 Per Year With TES Solution
By ARANER Posted 2016-06-09 In Thermal Energy Storage FARAH HOSPITAL TO SAVE 416,085 USD FARAH HOSPITAL TO SAVE 416,085 USD PER YEAR WITH TES SOLUTION PER YEAR WITH TES SOLUTION Industrial solutions for the health sector are a major issue. In buildings such as hospitals, that these solutions function well is not only a matter of comfort, but of health. This was the case at Farah Hospital, located in Amman (Jordan), which is considered the biggest and most prestigious hospital in the Middle East. During the construction of an extension building in 2012, they faced the necessity of state of the art cooling and heating technologies that would help them reduce energy consumption, especially the oil consumption. At Araner, we designed, manufactured and implemented based in the use of Thermal En