Case Study
EnviroMont burners - 1200 have been installed in 12 production lines at a major European baked-goods manufacturer.
EnviroMont burners - 1200 have been installed in 12 production lines at a major European baked-goods manufacturer.
1 INDUSTRIAL GAS ENGINEERS Unit D2, Brookside Business Park, Greengate , Chadderton, M24 1GS, England Telephone: 0161 -654 7700 Fax: 0161 -655 3812 e-mail: sales@montselas.co.uk www.montselas.co.uk EnviroMont Case Study Introduction. The first installation of EnviroMont burners has now been in successful operation for over four years. To date over 1200 burners have been installed in 12 production lines at a major European baked-goods manufacturer. In this time there have been no burner failures or replacements required. However this is not really a surprise for Mont Selas as the EnviroMont burner is based on a design principle which they have been using for over 10 years with great success and an excellent reliability record. This case study is based on