Case Study
Ensco 80 Drilling Rig
Case Study: Ensco 80 Drilling Rig Location: Verolme Shipyard (Netherlands) Operator: ENSCO During a scheduled shipyard visit amongst other planned activities there was a requirement to remove the tired existing coating and apply a new style coating (Eureka Fluid Film Gel BW) to the internals of a pre-load tank with the aim of extending the tanks service life. Sureclean Scope Provide manpower and equipment for the removal of the tired existing coating and apply the new coating in compliance with manufacturer’s guidelines. Technical Challenge Implementing a safe system of work and ensuring that the internal tank surface area was prepared to an appropriate standard prior to application of the new coating.Restrictions / Considerations Hazardous Environment - Confined Space Entry Working, acces