Case Study
Ensco 100 Drilling Rig
Case Study: Ensco 100 Drilling Rig Location: Dundee During a scheduled shipyard visit amongst other planned activities there was an initial requirement to remove the degraded existing coating and recoat the tank internals using a two coat system (Interzone 954) of a pre-load tank to extend the tanks service life. The workscope then increased to the blasting and recoating of a further 2 pre-load tanks and the subsequent UHP blasting of the main deck areas. Sureclean Scope Provide manpower and equipment for the removal of the degraded existing coating and apply the new coating in compliance with manufacturer's guidelines. Technical Challenge Implementing a safe system of work and ensuring that the internal tank surface and deck areas were prepared to an appropriate standard prior to applicat