Emergency response bypass keeps pulp mill operational during sewer line repairs

Emergency response bypass keeps pulp mill operational during sewer line repairs

Pages 1 Pages

DV200c pumps, HDPE pipeline and hoses provided 24-hour bypass pumping to keep the pulp mill operational All pump stations were monitored 24/7 to keep the mill online. Emergency response bypass keeps pulp mill operational during sewer line repairs PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com A Southern U.S. pulp mill entered emergency status following the collapse of a concrete main header. The plant’s sewer line was damaged in the collapse. An emergency call was made to Rain for Rent. A temporary bypass was needed to keep the plant operational while repairs were made to the sewer line. A two-station pumping bypass system was developed. The first handled up to 7,000 GPM utilizing HDPE, heavy duty suction hoses and three DV200c pumps. Statio