Case Study

East Kent Resignalling Phase 2

East Kent Resignalling Phase 2

© Copyright Vertex Systems Engineering. All rights reserved. CASE STUDY CASE STUDY #7 East Kent Resignalling Phase 2 Overview of Deliverables The East Kent Resignalling Phase 2 Project is the second phase of the overall East Kent Resignalling Programme, which will concentrate control of a significant portion of Network Rail’s Kent route into the East Kent Signalling Centre (EKSC), located at Gillingham. The principal purpose of the project is to improve asset condition, provide capacity & capability enhancements and deliver operational savings within the project area. The project comprises the total renewal of life-expired signalling on a section of the Chatham Main Line between the end of the Phase 1 project near Sittingbourne, and the Victoria Signalling Centre control area nea

Join for free to read