PROJECT SUMMARY This project involved the complete redevelopment of an existing 1960’s office building at the heart of London; Edinburgh House. This prominent building is located in Kennington, and Dutypoint were called in to install a storm water run- off solution. The project required storm water from the new car park areas and building run-off, to be collected, stored and then pumped away into the main sewer system in accordance to local water authority regulations. PROJECT CHALLENGE After a full site survey, we were presented with the challenge of overcoming a very high water table on site. This meant that the excavation process could be more difficult due to the ground being saturated in water. Additionally, this also meant that any underground installation would need to be he