Case Study
Dutypoint case study: Digital Reality Data Centre
PROJECT SUMMARY Dutypoint were contracted to supply a water system to a new state-of-the-art data centre in Amsterdam, The Netherlands. The purpose of the installation was to provide sufficient water supply to the vital server cooling HVAC system used to protect the servers from over-heating in the summer months. PROJECT CHALLENGE A unique consideration of this project came from the client requiring the ability to shut of the cooling system during colder months to protect against freezing. This meant we had to ensure that, any water storage tanks installed, could be totally emptied via an automated custom drain off system remotely managed by the client. The project also required an extremely high inlet flow rate in order to meet the demands of the internal HVAC system. Howev