Dutypoint case study: Project Mary - The Range

Dutypoint case study: Project Mary - The Range

Pages 1 Pages

PROJECT NAME Project Mary - The Range INDUSTRY SECTOR Construction PROJECT TYPE Distribution Centre CLIENT The Range Plc ARCHITECT AJA Architects LLP MAIN CONTRACTOR McLaren Construction PROGRAMME 12 months PRODUCT SUPPLIED VorTECH Vertical - Polyethylene Vertical Packaged Pumping Stations PROJECT SUMMARY: Project Mary, a new distribution centre in Central Park, Avonmouth was strategically selected by The Range to provide excellent transport channels to their stores throughout the UK. The building has a floor area of over 1,000,000 ft2, over 130km of pipework and the roof area will discard over 7000 l/s in worst storms. Due to the long runs of sewage pipes. PROJECT CHALLENGE: Five strategically placed sewage pump stations were required around the perimeter of the building to ke