Dutypoint case study: Leamington Gospel Hall

Dutypoint case study: Leamington Gospel Hall

Pages 1 Pages

Dutypoint Ltd, Shepherd Road, Gloucester GL2 5EL T: 01452 300592 | sales@dutypoint.com www.dutypoint.com PROJECT NAME Leamington Gospel Hall INDUSTRY SECTOR End user PROJECT TYPE Conference Centre CLIENT Leamington Meeting Room Trust PROGRAMME 8 months COMPLETION February 2017 PRODUCT SUPPLIED QuadraTANK PROJECT SUMMARY Leamington GHT contacted Dutypoint Systems as they were extending their conference centre and adding additional WCs and wash-hand basins. The current site operated via the mains water but with addition usage, there was a need for on site water storage and increasing the pressure throughout the system. PROJECT CHALLENGE With a serious lack of plant room space, a standard break tank and booster set wasn’t an option. PRODUCT SOLUTION Dutypoint Systems QuadraTANK w