Case Study

Distillery - Fleet Management

Distillery - Fleet Management

Pages 1 Pages

CASTLE PUMPS LTD Distillery - Fleet Management Case Study Information Customer Fleet Management Company Location United Kingdom Enquiry: ? We received an enquiry from a fleet management company with an urgent requirement to replace two vertical inline ballast pumps that were currently installed on board two vessels. The existing pumps had been supplied over fifteen years ago and were no longer performing as they should. ? In order to meet the vessels when they reach dry dock, the vertical inline centrifugal pumps needed to be manufactured and marine certified within a six week lead time. The difficulty in this enquiry was that the average lead time of these particular pumps is eight weeks. Solution: ? Thanks to the relationship we have built with the manufacturer, we were able to confirm t