Castle Pumps were approached by an engineering contractor that had been awarded the project of refurbishing a distillery
Castle Pumps were approached by an engineering contractor that had been awarded the project of refurbishing a distillery
CASTLE PUMPS LTD Distillery - Case Study Case Study Information Customer Distillery Location United Kingdom Enquiry: ? Castle Pumps were approached by an engineering contractor that had been awarded the project of refurbishing a distillery. One of the key components that needed upgrading was the heat exchanger. The previous heat exchanger was using sea water for cooling, which was being fed by a standard end suction centrifugal pump that was being manually primed by the operator. ? The distillery was experiencing a lot of down time due to the pump constantly losing its prime; an engineer frequently had to travel to the remotely located pump station and manually prime the pump. It was crucial to the distillery that the pump station was fully automatic and did not require an operator to manu