Case Study

ConocoPhillips Heidrun WI

ConocoPhillips Heidrun WI

Landmark: North Sea’s First Completion in Water Depths Over 350 m (1,150 ft) ConocoPhillips Heidrun WI Norway Blocks 6507/7 & 6507/8 Project Overview Contract Award: 1993 Sales: Kongsberg, Norway Fab. Trees: Dunfermline, U.K. Fab. Controls: Kongsberg, Norway Service Base: Bergen, Norway Host Type: TLP Contract Type: EPC Project Characteristics No. Trees: 6 Water Depth: 350 m (1,150 ft) Tree Type: Vertical Tree Pressure: 5,000 psi Tree Bor

Join for free to read