Case Study

ConocoPhillips Kepiting, Ikan Pari & SA-1,

ConocoPhillips Kepiting, Ikan Pari & SA-1,

Project Overview Contract Award: 1985 (Kepiting) 1988 (Ikan Pari) 1989 (SA-1) Sales: Singapore Fabrication: Singapore Service Base: Singapore Host Type: FPSO Contract Type: EPC Project Characteristics No. Trees: 2 (Kepiting) 3 (Ikan Pari) 1 (SA-1) Water Depth: 90 m (295 ft) Tree Type: Vertical Tree Pressure: 5,000 psi Tree Bore Size: 3”x2” Hydrocarbon: Oil Project Ownership ConocoPhillips 40% Texaco 25% Inpex 35% ConocoPhillips Kep

Join for free to read