Case Study
Heidrun Platform
unrivalled benefits REFURBISHMENT & REPAIR Reverse Engineering of Rotor Set for a GEC Parallel Shaft Gearbox driven by an RB211 Gas Turbine. The Heidrun platform, operated by Statoil ASA (now StatoilHydro ASA) is situated in the Norwegian Sea, about 200km off the coast of Mid Norway. It has a design production capacity of 220,000 barrels oil/day and 5 mill Sm 3 gas/day.The production began in 1995. On board the platform are 3 x RB211 gas turbine