Case Study
Conductor Cement Top Up System Assures Vital Integrity.
CONDUCTOR CEMENT TOP UP SYSTEM ASSURES VITAL INTEGRITY. Claxton’s cement top up system provides cost-effective back up to your primary conductor cementing operations. THE PROBLEM THE SOLUTION A secondary cementing system was designed for installation at the same time as the conductor to enable cement filling of possible voids in the annulus between the conductor and 36" well hole. Owing to the well’s depth, the cement top-up system was fixed to