Case Study
Replacement Conductor Guide Array Extends Platform Life By Two Decades.
REPLACEMENT CONDUCTOR GUIDE ARRAY EXTENDS PLATFORM LIFE BY TWO DECADES. A recent fabrication contract for a replacement jacket guide assembly project called for a radical Claxton engineered solution. The splash zones on offshore platforms are subjected to seawater exposure and high levels of lateral loading from the risers, and, in this case, it was clear that the entire splash-zone structure needed replacing. The solution Claxton proposed invol