Case Study
North Sea Operator Cement Top-Up System Efficient Top-Up Of Failed Primary Cement Job, Following Our System Diagnostics
North Sea Operator Cement Top-Up System Efficient Top-Up Of Failed Primary Cement Job, Following Our System Diagnostics
CASE STUDY/ CEMENT TOP-UP SYSTEM C 7 7 M20 Y 4 0 K05 CLIENT : NORTH SEA OPERATOR PRODUC T : CEMENT TOP-UP SYSTEM Aquaterra Energy were contracted by a North Sea Operator to supply and run a conductor Cement Top-Up System to help ensure cement integrity to the required cement level during their drilling program, offshore Denmark. EFFICIENT TOP-UP OF FAILED PRIMARY CEMENT JOB, FOLLOWING OUR SYSTEM DIAGNOSTICS B A CK GROUND The main focus of the requirement was to ensure that the system downhole components could be installed and run from the jack-up rig to mudline, by passing through the several 32” ID guides in the platform jacket. A total distance of approx. 115m from the install area had to be covered to ensure that cement could be pumped into the annulus. SOL UTION Aquate