THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Composite Solution Forties New Construction Oshore PIPE DETAIL 1,067-mm (42-inch) offshore gas pipeline 500 m (1,641 feet) repair length New construction New FBE-coated (Fusion Bonded Epoxy) pipe SUMMARY A 1,067-mm (42-inch) gas pipeline was being pulled through a 56-inch casing and along the seabed during an offshore installation Casing Spacers and Contour WA" abrasion-resistant wrap were applied to preserve line integrity Materials shipped to the worksite within 1 week Two, 30-person Clock Spring trained crews from Nirsa, a local distributor, worked around the clock to complete the installation in 5 days No hot work was required The products and installation allowed the