Composite Solution Replaces Damaged Casing Spacers

Composite Solution Replaces Damaged Casing Spacers

Pages 3 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Composite Solution Replaces Damaged Casing Spacers PIPE DETAIL SUMMARY Spacers were needed to replace original spacers that had corroded and failed to stay in place The line was under 975 psi (67.2 bar) pressure A trained team of Clock Spring technicians carried out repairs in approximately four days. The repair restored the pipeline to safe service without interrupting operations. The installation of the Clock Spring Spacers allowed the company to meet its safety objectives When inspection revealed that spacers had failed to stay in place on an encased pipeline under a highway, they immediately looked for a way to address the problem. An evaluation of the situation reveale