Contour Composite Repair Restores Offshore Firewater Line

Contour Composite Repair Restores Offshore Firewater Line

Pages 3 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Contour Composite Repair Restores Oshore Firewater Line PIPE DETAIL Multiple through-wall defects in a 203-mm (8-in) diameter main firewater line 8.17 mm (0.32 in) original wall thickness SUMMARY Multiple through-wall defects in a 203-mm (8-in) diameter main firewater line A team of 2 local Clock Spring trained technicians completed the Clock Spring Contour repair in 2 days No hot work was required during the Contour installation Workers on an offshore platform discovered multiple through-wall defects at a bend on the main firewater line when they pressurized the line and it failed. The decision was made to repair the line immediately to mitigate the risks associated with