Case Study

CIVMEC RC3 Reclaimer Buckets, Port Kembla Coal Terminal

CIVMEC RC3 Reclaimer Buckets, Port Kembla Coal Terminal

RESOURCES CIVMEC RC3 RECLAIMER BUCKETS, PORT KEMBLA COAL TERMINAL CLIENT: CIVMEC / LOCATION: NSW YEAR: 2016 / SECTOR: RESOURCES SCOPE OF WORKS Austline Fabrications were awarded the fabrication of 15 reclaimer buckets for the Port Kembla Coal Terminal in Wollongong, New South Wales. The design and fabrication required Austline to design an initial ‘jig’ to ensure consistency of build tolerance across all buckets. The tight timeframe of delivery required the universal fit as critical in the fabrication process. Throughout the fabrication process extensive MDR and ITP requirements were supplied to ensure all quality assurances and specifications were achieved. PROJECT TIMELINE Austline’s competitive and timely quotation enabled awar

Join for free to read