Case Study
Chambers Waste Management
Guildford, Surrey 185 tonnes Project Type Location Steel Tonnage Works Carried Out Foundations, Structural Steelwork, Roofing and Cladding, Pre-cast Concrete Wall Panels, Metal Decking, Intumescent Paint, Glazing, Concrete Floor Slab Over many years Robinson Structures have worked closely with the Chambers Group to complete a number of projects at their various depots in Surrey and Hampshire. Robinsons were recently appointed to design and construct a large side extension to the MRF comprising a 40-metre clear span, curved roof structure. Due to the raking site boundary and in order to maximise space, the rear gable end of the building was tapered by 75 degrees running parallel with the site boundary. In addition to the steel frame, Robinson’s scope of works was to cast foundatio