Case Study

Burneside Mill–Kendal

Burneside Mill–Kendal

Pages 1 Pages

As a part of the replacement of an adjacent  bridge  the  Client  was  concerned  that  the  con?gura on of the bridge beams acted as a  support for the main Mill building.  Removal  of  the  beams may  have  resulted  in  trans- verse movement of the Mill structure.      In order to check for any movement an in- strumenta on  system  was  installed  which  consisted of  lt sensors and Octopus 2 log- gers.   The  system  recorded  any  rota onal 

Join for free to read