Bromsgrove Electrification

Bromsgrove Electrification

Pages 2 Pages

“New electrification from Barnt Green to Bromsgrove” Bromsgrove Electrification Registration works MAY 17 - JUNE 18 BROMSGROVE 4.5 MILES OF TWIN TRACK ELECTRIFICATION VALUE £2.8M RAILWAY ELECTRIFICATIONBromsgrove Electrification P od-Trak worked as a key sub-contractor on the Bromsgrove Electrification Scheme, installing approximately 4.5 miles of new twin track electrification from the existing overhead line system at Barnt Green to the new relocated station at Bromsgrove. Pod-Trak were heavily involved in the overall scope delivering the 25kV booster less classic system electrification scheme, constructed predominately from NR Series 2 equipment range & UK1 where it was necessary to tie into the existing OLE system at Barnt Green. The OLE tie-in was completed under a h