Brigg Renewable Energy Plant, UK

Brigg Renewable Energy Plant, UK

Pages 2 Pages

BRIGG RENEWABLE ENERGY PL ANT, UK Case stories - BWE BoilersBurmeister & Wain Scandinavian Contractor A/S Gydevang 35 ? DK-3450 Allerød ? Denmark Phone: +45 4814 0022 ? bwsc@bwsc.dk ? bwsc.com BWSC-30-0034-rev04-09/18 Boiler data Steam 155 t/h, 112 bar and 540°C Boiler efficiency 92.3% (EN 12952-15) Heat input 117 MJ/s Foot print 31.2 m x 32.0 m Boiler house height (internal) 30 m C A SE STORIES - BWE BOILERS Straw 100% Wood chips up to 22% ECO2 Lincs Ltd. chose a BWE Boiler for the complete greenfield straw-fired biomass plant located in Brigg, UK. Plant capacity is 40 MWe and has a net plant efficiency of 34%. The contract was awarded in November 2013 and was completed in January 2016. The plant The Brigg Renewable Energy Plant (Brigg REP) was built for production of electricity