Case Study

BMO Plaza

BMO Plaza

Pages 1 Pages

PROJECT PROFILE WJE www.wje.com BMO Plaza Facade Access Anchorage Load Testing and Certification | Indianapolis, IN CLIENT Redico Management, Inc. (Redico) BACKGROUND The BMO Plaza was constructed in 1988 by Duke Construction Management for Phillip R. Duke & Associates. The office building consists of a twenty-nine-story office tower with six levels of parking from the basement through the sixth floor. Facade access on the building is provided by swing stages, rope descent systems, or industrial rope access. Dedicated facade access anchorages consist of 156 eyebolt-type anchors distributed in the lower and upper thirds of the building height. SOLUTION WJE perform

Join for free to read