Case Study

Biogen Idec Data Center Cambridge, MA

Biogen Idec Data Center Cambridge, MA

Biogen Idec Data Center Cambridge, MA Program Summary • Total Installed Cost: $179,840 • NSTAR Incentives: $53,273 • Final Biogen Idec Cost: $126,567 • Annual Electricity Savings: 387,327 kWh • Simple Payback: 2 Years Energy Efficiency Measures • Controls • HVAC COMPREHENSIVE ENERGY ANALYSIS AND DATA CENTER UPGRADES Energy usage in Biogen Idec’s Data Center in Cambridge, MA was significantly reduced with a zero-impact solution, implemented by ENGIE Services U.S. (ENGIE). The solution cut energy costs, corrected system malfunctions, and provided Biogen Idec with a high level of working knowledge and control over HVAC operations. THE PARTNERSHIP The data center energy efficiency solution helped alleviate a short-circuiting problem, which was occurring with increasing frequency, ste