Case Study
Biodiesel Upgrade
Biodiesel Upgrade | Harris Group Inc. BP Pipelines (North America) The BP Portland terminal was upgraded to expand storage of biodiesel and add blending capability to outbound marine and pipeline shipments. Harris Group’s services included front-end planning and development of an authority for expenditure (AFE) funding package, cost estimating, project schedule, process design criteria, P&IDs, equipment lists, mechanical/electrical one-line diagrams, structural design, piping design, electrical design, controls and instrument design, and specifications. The project included above ground storage tank modifications, tank vent dryers, heat exchanger, biodiesel supply pumps, biodiesel blending equipment, modifications to existing motor control center (MCC) for additional loads, and controls sc