Case Study

BEYER CONSTRUCTION

BEYER CONSTRUCTION

FIELD REPORT: BASELINETM STEEL FORMS BEYER CONSTRUCTION 3334 N. Booth Street, Milwaukee WI 53212 U.S.A I 414.964.4550 I 414.964.4503 EMAIL: info@metalforms.com I www.metalforms.com Houston Subdivision Paving Beyer Construction plays a key role in building the roads and streets needed to support Houston's booming population. Beyer has seven road building crews that utilize the Speed Screed®. Each Beyer crew consists of approximately 25 skilled tradesmen who finish more than 1,200 cubic yards of concrete a week, which equates to over 8,000 cubic yards combined per week, and more than 400,000 cubic yards per year. Talk about impressive! In addition to the screeds MFC and CPSI supply, Beyer also uses MFC Base-line® forms in all paving operations. The relationship of MFC, CPSI and Be

Join for free to read