Case Study
Belanak: Natuna Sea, Indonesia
Highlights Designed for a 30 year life without the • need for dry docking 255,000 DWT vessel, 26,500 DWT topsides, • 1 million barrels dual product storage Hull built in China, Topsides built and • installed in Indonesia LPG facility CLOSEST thing to FLNG • currently available For more information contact KBR at 713.753.2000 or www.kbr.com Belanak Natuna Sea, Indonesia One of the most complex offshore processing facilities ever installed Cli