Case Study

Belanak: Natuna Sea, Indonesia

Belanak: Natuna Sea, Indonesia

Pages 1 Pages

Highlights Designed for a 30 year life without the • need for dry docking 255,000 DWT vessel, 26,500 DWT topsides, • 1 million barrels dual product storage Hull built in China, Topsides built and • installed in Indonesia LPG facility CLOSEST thing to FLNG • currently available For more information contact KBR at 713.753.2000 or www.kbr.com Belanak Natuna Sea, Indonesia One of the most complex offshore processing facilities ever installed Cli

Join for free to read