Case Study

JIP GURF 2 Floating LNG

JIP GURF 2 Floating LNG

Pages 1 Pages

Highlights KBR led project • Included evaluation of SMR, DMR, C3MR, • Cascade, Prico, and N2 techonology Comparisons made with respect to safety, • operability, technical risk, economics, flare size, and footprint. Cost estimate based on 49-56 month schedule • For more information contact KBR at 713.753.2000 or www.kbr.com JIP GURF 2 Floating LNG Rough Tropical Sea Karratha Client - Location - Rough Tropical Sea Scope - 3-4 MTPA FLNG train

Join for free to read