BWE30-0031rev2 In cooperation with the German Company we installed the first straw fired steam generator in Germany which supply process steam and electricity to a nearby process installation as well as district heating to Emlichheim city and electricity to the grid. Key figures, steam generator: o Steam data: 67 t/h, 112 bar & 522 C Boiler efficiency: 92% Heat input: 49.9 MJ/s (straw only, support firing not necessary) Foot print: 25.2 x 43.2 m Height of boiler house: 28 m 3D model of Fuel mixing Emlichheim will be a 100 % straw fired plant. In other plants co- firing with other types of biomass like wood chips has been realized. The share of co-firing depends on the properties of the fuels. Due to the feeding system a minimum of 50% of the heat inp