Case Study

Pleora Railway Inspection

Pleora Railway Inspection

Pages 2 Pages

CASE STUDY Pleora Railway Inspection Faster Railway Inspection with flexible Connectivity Deploy Camera Link Full cameras in multipoint, real-time video networks using low-cost, long- distance Ethernet cabling Camera Link Full cameras are typically deployed in railway inspection systems due to their high-bandwidth performance, but designers must compensate for the camera’s complex, limited reach cabling and lack of networking support by deployi

Join for free to read