Case Study
Baker Hughes Monitoring System Saved Permian Basin Operator USD 80,000
Case History Failure risk Following a chemical treatment program, ? eld personnel for a large, independent operator restarted a Permian Basin well. They inadvertently restarted the well with the tubing and casing valves closed. The well immediately began to cycle, putting the electrical submersible pumping (ESP) system at risk of failure. Baker Hughes solution A Baker Hughes engineer was remotely monitoring the ESP system and the well u