Ardchattan
Hydropower Clean, renewable energy from water Ardchattan Case Study Gilbert Gilkes & Gordon Ltd., Canal head North, Kendal, Cumbria LA9 7BZ t 01539 720028 • f 01539 732110 hydro@gilkes.comSummary: Ardchattan Case Study The Ardchattan Hydro Scheme is a Summary: Head of water: 94m Length of pipe work: 1,500m Catchment area: 14 km 2 Power produced: 920kW The catchment area feeding the Ardchattan scheme is approx 14 square kilometres and is subjec