Case Study

Abernethy Trust

Abernethy Trust

Pages 7 Pages

Hydropower Clean, renewable energy from water Abernethy Trust Hydro Case Study Gilbert Gilkes & Gordon Ltd., Canal head North, Kendal, Cumbria LA9 7BZ t 01539 720028 • f 01539 732110 hydro@gilkes.comSummary: Abernethy Trust Hydro Case Study The Abernethy Trust Hydro Scheme is a Summary: Gross head of water: 126.4 m Design Flow: 96 litres/second Pipe work: 850m long by 285mm OD Catchment area: 1.6 km 2 Average annual rainfall: 2,376mm Power produc

Join for free to read