Case Study
Archer
Archer Blackburn, Aberdeen 20,000 Sqm Stratec G30PP Geogrid Main Contractor: Morrison Construction Plc April 2013 Case StudyThe Problem The Groundworks Sub Contractor were faced with having to cut and fill in depths of up to 3m to bring up the site levels. The ground being mainly a clay substance they were faced with the challenge of stabilising the entire site in particular