Case Study
Margaret Ekpo Int. Airport Bypass
Margaret Ekpo Int. Airport Bypass Nigeria 213,695sqm Stratec G30PP Biaxial Geogrid Case Study Main Contractor: Sermatech Nig Ltd February 2013The Problem Main Contractor Sermatech Nig Ltd were faced with swamp like conditions in areas and having to build the road up considerably to the working platform. The ground conditions were extremely silty and in weak areas more than one layer of