Case Study

Industrial Yard, Peterhead

Industrial Yard, Peterhead

Industrial Yard Peterhead 10,270m2 Stratec G30PP-GC Geogrid/Geotextile Composite Main Contractor: Finnie 4 x 4 June 2015 Case StudyThe Problem This project included the removal of a disused railway embankment that cut across the site and approximately 1.5m of cut and fill took place. Due to the poor clay soils that were present and the inclement weather the ground

Join for free to read