Case Study
Airbus, A350 Wing Assembly Building, Broughton
Murraywood Construction Ltd Case Study - Airbus, A350 Wing Assembly Building, Broughton Project : Airbus – A350 Wing Assembly Building, Broughton Client: Morgan Sindall Total Project Value: £100 Million Subcontract Value: £28.3 Million Commenced: December 2007 Duration: 147 Weeks Scope: Large enabling works package consisting of installation of 1.5m diameter pipes over 400m length in total, to form attenuation which was then pumped over a rising main to a bespoke lagoon constructed out of vinyl sheet piles. Full groundworks package then to build new wing manufacturing facility. Murraywood received various awards for Innovation, Integration and Collaborative Working, Safety, and Environment during this project. Overall the proj