Case Study

AAEngineering Industrializes Delivery of Gold Ore Processing Plant in Seismic Region

AAEngineering Industrializes Delivery of Gold Ore Processing Plant in Seismic Region

Pages 2 Pages

CASE STUDY AAEngineering Industrializes Delivery of Gold Ore Processing Plant in Seismic Region Bentley’s Open Applications Saved USD 2 Million and Commissioning Ahead of Schedule INVESTING IN REGIONAL AND NATIONAL GOLD PRODUCTION Situated in the T alas region near the Kara-Bura mountain pass, Dzhamgyr deposit is just one of Kyrgyzstan’s numerous gold fields. Since 2009, the ore from this mine has been exported to Kazakhstan for processing. In an effort to move away from exportation and invest in regional and national economic and industrial development, Kyrgyzstan is working to create a closed cycle of gold production, where both the extraction and processing of ore is carried out within their country. Aligned with this vision, they decided in 2018 that a gold processing

Join for free to read