Case Study

A83 Trunk Road Widening Scheme

A83 Trunk Road Widening Scheme

Ian  Farmer  Associates  were  commissioned  by  Scotland  Transerv,  acting  on  behalf  of   Transport  Scotland,  to  undertake  a  ground  investigation  for  the  proposed  widening  of   the  A83  trunk  road.  The  section  of  the  route  was  approximately  2km  in  length.  The  site   operations  required  Tra?c  Safety  provisions  and  the  

Join for free to read