Case Study

A London Crown Court was left without heating and hot water when a boiler failed, threatening to interrupt legal proceedings and halt work of the cour

A London Crown Court was left without heating and hot water when a boiler failed, threatening to interrupt legal proceedings and halt work of the cour

ONE CALL – ALWAYS THE RIGHT SOLUTION! 0800 026 4717 The challenge Facilities Management Boiler Hire Crown Court, London 500kW Boiler Hire A London Crown Court was left without heating and hot water when a boiler failed, threatening to interrupt legal proceedings and halt work of the court. What did we do? Carrier Rental Systems reacted quickly after receiving an emergency call following the unexpected breakdown of the court’s hot water and

Join for free to read