Case Study
On-site boilers at a bio-digester plant had failed, resulting in an interruption of the fuel gas production process due to system cooling. The challen
On-site boilers at a bio-digester plant had failed, resulting in an interruption of the fuel gas production process due to system cooling. The challen
ONE CALL – ALWAYS THE RIGHT SOLUTION! 0800 026 4717 The challenge Utilities - Water Bio-Digester Bio-Digester Heating, Kent 2000kW Boiler Hire On-site boilers at a bio-digester plant had failed, resulting in an interruption of the fuel gas production process due to system cooling. The challenge was to quickly design and implement a temporary replacement system to restore operation, while a long-term solution was implemented. What did we do? O