Case Study

A £13.8m project to extend Tollcross International Swimming Centre for the 2014 Commonwealth Games left a big shortfall in pool heating capacity

A £13.8m project to extend Tollcross International Swimming Centre for the 2014 Commonwealth Games left a big shortfall in pool heating capacity

ONE CALL – ALWAYS THE RIGHT SOLUTION! 0800 026 4717 The challenge Construction Heating Hire Swimming Centre, Glasgow 400kW Heater Hire A £13.8m project to extend Tollcross International Swimming Centre for the 2014 Commonwealth Games left a big shortfall in pool heating capacity. What did we do? Carrier Rental Systems provided a temporary heating system to top up the existing system, to ensure pool conditions could be maintained at the req

Join for free to read