Case Study

5,000 GPM of PCB-laden water filtered for large remediation project

5,000 GPM of PCB-laden water filtered for large remediation project

Pages 2 Pages

The 800,000 gallon MOD tank in the foreground allowed for settling of contaminants pumped from the SMU. The effluent then went on to additional polishing. The frac tanks supplied clean water for backwash. To prevent seepage, Rain for Rent pumps take effluent from geo tubes for finer polishing of PCB sediment along filtration train. 5,000 GPM of PCB-laden water filtered for large remediation project PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com A South Carolina superfund site had a creek with PCB-laden silt and sediment that needed to be dredged and removed. The contaminants came from a manufacturing plant along the river near the South Carolina-Georgia border. The site is set to become a greenway area for thousands of outdoor enthusiasts for r

Join for free to read