Wet dredging PCB remediation project cleans creek with filtration system

Wet dredging PCB remediation project cleans creek with filtration system

Pages 1 Pages

Phase three of a PCB remediation project in Ohio began in early 2013. The treatment system was capable of filtering 2,000 GPM of creek and storm water. Pumps, filtration units, tanks and carbon units provided treatment that exceeded EPA water quality standards. Wet dredging PCB remediation project cleans creek with filtration system PumPs • Tanks • FilTraTion • PiPe • sPillguards 800 742 7246 rainforrent.com R emediation efforts entered a third phase to clean an Ohio creek of PCBs in early 2013. The PCBs leached from a nearby steel production facility. The producer worked with the EPA to provide clean-up efforts. Rain for Rent was called to assist with wet dredging of the creek. This style of dredging allows the flow of the creek to continue, lowering the total environmenta