100,000 GPM Bypass Restores Water for City Inundated by Hurricane Flooding
100,000 GPM Bypass Restores Water for City Inundated by Hurricane Flooding PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com BACKGROUND The residents of Beaumont, Texas, along with several nearby refineries and chemical plants, receive drinking and process water from a series of pump stations and canals. With the deluge of rain from Hurricane Harvey, the Neches River flooded and overwhelmed the city’s primary pumping station’s engines, taking them offline. With the flow to the subsequent pump stations cut off, the River Authority managing the water system required a 100,000 GPM system to temporarily bypass the primary pump station and re-establish a flow of water until the primary station could be brought back online. OUTCOME Rain for Rent delivered and