Eight pumps provided the bypass power for the planned 25 MGD system. Minnesota’s cold winter did not delay the install process for the wastewater treatment plant bypass. The bypass system was designed to handle 25 MGD of wastewater. 25 MGD bypass by Sewer Water A-Team handles exceeded flow during upgrades PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com A large urban wastewater treatment system in Minnesota was scheduled for a $250 million overhaul. The plant is one in group of seven that serves the metro population of more than 2.8 million.The contractor in charge of the rehabilitation needed a 25 MGD sewer bypass while the upgrades were made. The bypass would be performed during the harsh Minnesota winter. The contractor researched capable com